Green Buildings

green building

Sustainability Buildings

Residential Solar Design Services

Our worldwide experience in Buildings helps us provide 360⁰ BIM solutions ranging from complex multi-use development buildings, high-rise office spaces, hospitality, and recreational centers. Our modus operandi is to prioritize living experience for building users and place the occupants at the epicenter of our approaches.

We have consciously built our business to ensure that your design engineering needs are aligned with the UN Sustainable Development. We not only offer energy efficient and green construction technologies but also empower our clients with proactive maintenance. We support our clients with

  • LEED Certification
  • Energy Performance Analysis
  • Building Energy Optimzation
Download Portfolio
green building

Life Cycle Assessment

Residential Solar Design Services

The bi-directional Building Information Modeling (BIM) integration into asset management software facilitates superior visualization of assets and helps in the maintenance and operation of a facility. To ensure our clients with the best that technology has to offer, we assess the various performance indicators covering the interests of owners, operators, and occupants in aspects like energy, lighting, thermal comfort, and maintenance.

Lifecycle Assessment (LCA) allows different building professionals to recognize the varying environmental impact associated with the different stages of a construction project. It goes beyond a carbon footprint – it considers energy utilization, resource depletion, habitat destruction and so on.

BIM CATEGORIES

Explore Design Services

Solar Permit Services
Professional Consultancy
Explore

Frequently Asked Questions

1. Will I need a permit to install my charger? If so, how long will that take?

Yes, Permit is mandatory for all 50 states of the US. Make sure that you work closely with our Project manager so that he will guide you in understanding all the aspects needed for installing an EV charger in your home.

2. Why does my Level 2 charging station have to be multi-port?

Multi-port charging stations maximize the value of the rebate by being more cost-effective per port than single-port charging stations. Additionally, workplaces and other public facilities have been responding to the increasing demand for EVs and recognizing the need for one charging station to serve more than one EV.

3. Why is the rebate only for Level 2 chargers and DC fast chargers? Why not Level 1?

Level 2 and DC fast-charging stations provide faster charging speeds than a Level 1 station while offering greater durability and meaningful features, such as network connectivity that provides real- time data on the status of the charging unit, the convenience of making onsite payments, and the ability to reserve time slots to utilize the charger. Faster charging speeds enable higher turnover of usage of the charging stations and, therefore, increasing the number of EV owners who can charge their EV's there per day.

4. Do you carry any Insurance?

We have professional liability insurance for errors and omissions with an aggregate claim value of 2 million dollars  but thankfully there has been no claim so far.

5. When is the payment due?

Usually before 30 days from the receipt of invoice, but there are also case-by-case adjustments pertaining to situations.

6. What are the methods of payments?

Credit Card, Debit Card, Wire transfer, online cash transfer.

7. Can you do permit plans for EV charging stations?

Yes, we are well-versed in providing designs for EV chargingstations for both residential and commercial use.