Geographic Information Systems

GIS

Sustainable Assets & Infrastructures

Residential Solar Design Services

Illumine-i stands tall in delivering complex infrastructure together with our rich clientele. We offer solutions at all magnitude and criticality. Our BIM-BAM (Building Asset Management) approach provides a more promising and rational way to handle the vast data related to infrastructure constructions from the conceptual design through commissioning and operation. We deliver BIM services for infrastructure projects that include:

  • Roads and Highway Development
  • Airport Development
  • Rail Engineering
  • Bridge Design

Better urban planning with sustainable assets and infrastructure make cities more inhabitable and inclusive. Our services for infrastructure designs include developing LOD 100 to LOD 500 models, BOMs, RFIs, QTO, Steel Fabrication drawings and Steel Detailing, Structural Analysis, and much more.

Download Portfolio
GIS

Digital Twins

Residential Solar Design Services

Through the capabilities of digital twins, we help our clients capture the behaviors and processes involved in construction of their projects. With real-time data collection through sensors, we can provide predictive simulations of show how the project will behave in a changing environment.

BIM CATEGORIES

Explore Design Services

Solar Permit Services
Green Buildings
Explore
Solar Permit Services
Professional Consultancy
Explore

Frequently Asked Questions

1. Will I need a permit to install my charger? If so, how long will that take?

Yes, Permit is mandatory for all 50 states of the US. Make sure that you work closely with our Project manager so that he will guide you in understanding all the aspects needed for installing an EV charger in your home.

2. Why does my Level 2 charging station have to be multi-port?

Multi-port charging stations maximize the value of the rebate by being more cost-effective per port than single-port charging stations. Additionally, workplaces and other public facilities have been responding to the increasing demand for EVs and recognizing the need for one charging station to serve more than one EV.

3. Why is the rebate only for Level 2 chargers and DC fast chargers? Why not Level 1?

Level 2 and DC fast-charging stations provide faster charging speeds than a Level 1 station while offering greater durability and meaningful features, such as network connectivity that provides real- time data on the status of the charging unit, the convenience of making onsite payments, and the ability to reserve time slots to utilize the charger. Faster charging speeds enable higher turnover of usage of the charging stations and, therefore, increasing the number of EV owners who can charge their EV's there per day.

4. Do you carry any Insurance?

We have professional liability insurance for errors and omissions with an aggregate claim value of 2 million dollars  but thankfully there has been no claim so far.

5. When is the payment due?

Usually before 30 days from the receipt of invoice, but there are also case-by-case adjustments pertaining to situations.

6. What are the methods of payments?

Credit Card, Debit Card, Wire transfer, online cash transfer.

7. Can you do permit plans for EV charging stations?

Yes, we are well-versed in providing designs for EV chargingstations for both residential and commercial use.