EV Charging Station Design

Get Free Estimation
EV Charging Station Design
EV Charging System

EVCS Design Services

Residential Solar Design ServicesEV Charging Station Design

With over 300 installers, contractors, and energy consultants in our Client Data base, Illumine Industries has become a house-hold name in the Solar Industry. And now we have begun the next chapter of our journey. Marching towards our vision, “To Support Every Human and Every Company on the Planet Achieve Sustainable Living”, we have now ventured into Sustainable Transportation.

Electric vehicles have been celebrated by conservationists as the cleanest means to do transportation. Sooner EV’s will the predominant mode of transportation.

Thanks to our vibrant team of EV enthusiasts, Illumine Industries has already designed over 100 EV Charging Stations across the United States. Quality matters to our engineers more than anything else. It is precisely the reason why we hold an impressive record for first time AHJ Approvals. Our EVCS Project designs are no different either.

Considering your project requirements, we deliver EV Charging Station Permit Plans, with the assistance of professional engineers with vast experience designing EV infrastructure.

  • EV Charging Station Design Layout
  • Feasibility Study
  • Electrical and Structural Engineering
  • Permit Coordination
  • Professional Services
  • Project Management

Our EVCS plan set provides the following details for the installation of the Charging System, with or without battery backup, and for the residential or commercial systems which are Grid-tied or Off-Grid. The plan set is drafted to meet all state, local, and utility requirements.

  • Cover Sheet
  • Site Plan
  • Electrical Plan and Calculations
  • Single Line Diagram
  • Three Line Diagram (for commercial)
  • OCPD Calculations
  • System Information and Applicable Codes
  • Labels & Datasheets (Spec Sheets)
  • And all that is necessary for an approved permit

Frequently Asked Questions

1. Will I need a permit to install my charger? If so, how long will that take?

Yes, Permit is mandatory for all 50 states of the US. Make sure that you work closely with our Project manager so that he will guide you in understanding all the aspects needed for installing an EV charger in your home.

2. Why does my Level 2 charging station have to be multi-port?

Multi-port charging stations maximize the value of the rebate by being more cost-effective per port than single-port charging stations. Additionally, workplaces and other public facilities have been responding to the increasing demand for EVs and recognizing the need for one charging station to serve more than one EV.

3. Why is the rebate only for Level 2 chargers and DC fast chargers? Why not Level 1?

Level 2 and DC fast-charging stations provide faster charging speeds than a Level 1 station while offering greater durability and meaningful features, such as network connectivity that provides real- time data on the status of the charging unit, the convenience of making onsite payments, and the ability to reserve time slots to utilize the charger. Faster charging speeds enable higher turnover of usage of the charging stations and, therefore, increasing the number of EV owners who can charge their EV's there per day.

4. Do you carry any Insurance?

We have professional liability insurance for errors and omissions with an aggregate claim value of 2 million dollars  but thankfully there has been no claim so far.

5. When is the payment due?

Usually before 30 days from the receipt of invoice, but there are also case-by-case adjustments pertaining to situations.

6. What are the methods of payments?

Credit Card, Debit Card, Wire transfer, online cash transfer.

7. Can you do permit plans for EV charging stations?

Yes, we are well-versed in providing designs for EV chargingstations for both residential and commercial use.
Get Free Estimation