top of page

Extra engineering capacity for the sites Resound just won funding for.

Resound and its partners picked up roughly $8M in the state's second WAEVCP round - more than 30 sites across King County Housing Authority, Seattle Housing Authority, and Greystar properties, plus four new public DC fast charging locations. That's on top of the 151 sites and $21.5M Resound already delivered in Round 1. Illumine-i sits behind Resound's estimators, electricians, and civil crews as overflow engineering capacity when design and permitting volume outpaces what an in-house team can turn.

Grid integration engineering diagram showing solar, BESS, substation, and EVCS assets connected by energy circuit paths

EV Charging & Electrical Infrastructure - Scope Split

Resound keeps the client relationship, the install crews, and the funding navigation it's known for. Illumine-i sits behind it as overflow drafting and stamping capacity when the site count outpaces in-house design bandwidth - not instead of it.

0%

20%

40%

60%

80%

100%

Illumine-i bench

Engineering capacity that extends the team when a grant window, a new AHJ, or a volume spike puts more on the design queue than field crews can wait on.

Core scope - Resound Energy

Resound keeps the client relationship, the install crews, and the funding navigation it's known for.

2300+
EVCS projects delivered

98%
First-pass AHJ approval

50
States covered

12000+
Charging units designed

WHERE THIS FITS

Three places the Round 2 award adds real engineering load

Each one traces back to what Resound has already published about the award - nothing here is inferred beyond that.

PROJECT CHALLENGE
IMPACT ON DELIVERY
ILLUMINE-I ADVANTAGE
Cumulative volume beyond typical in-house bandwidth
Round 1 alone was 151 sites and $21.5 million. Round 2 adds 30+ more, concurrently — a load-calc, SLD, and permit paperwork volume that scales faster than a turnkey contractor typically staffs design seats.
Evolve generates 30% plan sets, BOMs, and SLDs in minutes so new scope doesn't sit waiting on a design hire.
Fast charging outside the core service territory
The four public DC fast charging sites in Round 2 sit outside Resound's historic Seattle / King County base — new jurisdictions, new utility interconnection processes, unfamiliar permitting timelines.
2,100+ EVCS projects across 50 states means AHJ patterns for these towns are likely already on file.
Parallel permitting across housing authorities
Round 2 spans 16 King County Housing Authority sites, 11 Seattle Housing Authority sites, and 3 Greystar properties — all moving through design and permitting at once, each with its own AHJ and utility contact.
SLDs and permit packages run in parallel so field crews aren't waiting on drawings from a single design queue.
WHY US
From concept to stamped drawing, without switching vendors
EVOLVE OUTPUT - GENERATED IN MINUTES

Site Qualification
 

EV Charger Layout
 

BOM
 

Cost Estimate
 

SLD
 

Electrical Calculations
 

Load Analysis
 

Client Proposal

Evolve and Illumine-i's engineering bench are one pipeline. Evolve handles the fast, repeatable outputs; anything that needs a PE stamp escalates to the same team, under the same roof.

ENGINEERING DELIVERABLES - ILLUMINE-I 

Civil Engineering

Electrical Engineering

 

Structural Engineering

 

Utility Coordination

 

Permit Package

 

PE Stamps

 

Construction Drawings

 

AHJ Support

SERVICES

What the bench actually covers

01
Preliminary Engineering

Feasibility, site qualification, and 30% plan sets to move a site from award to buildable scope quickly.

02
Detailed Engineering

PE-stamped SLDs, load analysis, structural, and civil/site design carried through to permit-ready construction drawings.

03
Project Management

Utility coordination and AHJ permitting managed in-house, tracked across every site in a multi-site award.

04
Independent & Owner's Engineering

Development consulting and independent engineering review for funders, housing authorities, or partners who need a second set of eyes.

NATIONWIDE EXPERIENCE
Trusted on 2300+ projects across the nation

From coast to coast, we've delivered engineering and permitting services for EV charging projects nationwide. The highlighted states reflect where we've completed the highest concentration of work - our deepest experience and strongest track record.

EV_Map.png

Talk through what's on the queue.

bottom of page